New Sod Care-Watering

I recently installed new sod at a customer’s property, and thought this would be a good time to provide some tips on how to water the new sod after installation.

Here is a checklist for watering new sod.

  1. Lightly sprinkle water on the bare soil as you install your new lawn. This will cool the soil providing a better environement for new, tender roots.
  2. Using a hose, water each piece of sod within 15 minutes of being laid on the soil.
  3. Give your new lawn one inch of water withing 1/2 hour of completed installations. When finished, the lawn should be “squishy wet.” This is the only time you will water the sod making it “squishy wet.”
  4. Water your new lawn 2-3 times during the hottest part of the day for the first two weeks. Short, frequent waterings are best, 5-20 minutes on each cycle. Shorter for spray heads, longer for impact or rotors.
  5. Keep your new lawn moist but do not soak. Water as needed to maintain adequate moisture. New BioGrass lawn establishment usually takes two weeks, depending on weather, temperatures, etc.
  6. Change your sprinkler timer according to the demands of your lawn, and the environment. Common factors are: wind, rain, sunlight, shade and reflected light.